Septic Installation
What to expect
The design is done, the permit is approved and it’s time to install your septic system.
As a homeowner what should you expect from us?
Prior to the installation we will meet onsite to discuss what your expectations are. We will always do our best to protect any trees or structures on your site. Often people say that their site looks better after we have installed their systems.
Most installations are completed within 3 days.
Our crew will be courteous and safety conscious.
When we are done your site will be graded, grass will be seeded and mulch will be on top of the excavated areas unless you would like us to do something different. If there were rocks dug out during excavation, there may be a new retaining wall around the septic tank or on the side of your home. Any trees that were taken down will have been hauled out, or stacked to the side where you wanted them.
After the installation is complete we will meet with you, go over all of your system components, give you the owner’s manuals for any parts, and check off what we went over a few days prior to be sure that everything is completed to your satisfaction.